Cherrybrook
- The previous setup had you walking through the downstairs bathroom to get to the laundry
What we did:
- We demolished both the bathroom and laundry
- Chased new pipe and stack work through the concrete slab
- Swapped the bathroom to the back section and the laundry to the front.
- Moved windows
- Widened the doorway and installed a cavity slider
- Upgraded electrical
Before
After
Berowra
What we did:
- We added a second floor, including:
- Three bedrooms, master with walk in robe
- Upstairs bathroom
- Extensive structural work to hide new beams and posts to support the addition into existing walls
- Consolidated previous garage conversion into an extension of the main living area
- Majority of works were timed to take place over a couple of weeks while the clients were away minimising disturbance to them while there was no roof and there were props all through the house
Before
After
West Pennant Hills
What we did:
- We added two extra bedrooms, a landing and linen press by putting a second level above the garage, creating a clean easy flow between the split levels
- We sourced bricks to match the existing brickwork
- We married and matched the new stairs in with the old
Before
After
Westleigh
What we did:
- Extensive external works
- Excavate site
- Front yard retaining walls and landscaping
- Installed lighting and irrigation in front yard
- Travertine paving
- Back yard retaining walls with merbau cladding
- Build carport
- Build new pool filter box
Before
After
Glynn and Lee – Wahroonga
What we did:
- Floor plan remodel to given open and modern living style
- New kitchen
- New ensuite and main bathrooms
- large bifold doors to outdoor area
Before
After
Valley Park
What we did:
- Bathroom renovations
- New tiling throughout the house